Proven Biomass Energy Projects
Explore real industrial projects where biomass energy solutions have reduced fuel costs and ensured stable production.
Aluminum Factory Biomass Gasification Project
A biomass gasification system was installed to replace heavy oil in aluminum melting furnaces.
The project achieved stable high-temperature heating while significantly reducing fuel costs and carbon emissions.
• Fuel cost reduced by 25%
• CO₂ emissions reduced by 50,000 tons/year
• System efficiency above 85%
Tire Factory Steam Cost Reduction Project
A 15-ton biomass gasifier replaced natural gas boilers.
The system ensures stable steam supply while reducing production costs.
• Steam cost reduced from $40 to $25 per ton
• Monthly savings over $90,000
• Stable pressure at 1.75 MPa
Paper Mill Biomass Retrofit Project
Natural gas boilers were converted to biomass energy systems, reducing steam costs by over 30%.
The project achieved annual savings of over $1 million with zero upfront investment.
Reduce Your Industrial Energy Cost by 30–60%
Tell us your boiler type, fuel, and capacity. We will provide a customized biomass energy solution.